T: +44 (0) 28 8076 1900 E: reception@mceservices.co.uk

Grafton Street, Dublin

The works involved the removal of internal Asbestos insulation board window panels throughout each floor of the building.

This project which we have recently completed involved the removal of internal Asbestos insulation board window panels throughout each floor of the building.

Grafton Street, Dublin

All of these asbestos areas were carried out under fully controlled conditions with each floor requiring scaffolding erected outside the premises to create a working platform on each floor level on which our airtight enclosures could be erected.

The project had to be carefully planned to ensure the continuity of works has access to and from the building, as deliveries could not take place after 9am and before 7pm. If not planned properly, a delay to a delivery could possibly set a very tight programme back a day or more.

Get in Touch

We operate throughout England, Scotland, Wales and Ireland.

Contact us today

Our certifications